I75 over NORMAN CHAPEL RD. (3660)

IN CLEVELAND CITY LIMITS · County 011, Tennessee · Built 1964 · 2 Lanes · 52,196 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
06I00750019
Year Built
1964
Length
35.1 m (115.2 ft)
Max Span
14.2 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
52,196
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$769,000
Total Project Cost
$1,154,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.