NFA 1185 (SA 0610) over SOUTH MOUSE CREEK

.1MI EAST OF I75 · County 011, Tennessee · Built 1939 · 2 Lanes · 694 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
06011850001
Year Built
1939
Length
40.2 m (131.9 ft)
Max Span
14.9 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
694
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,012,000
Total Project Cost
$1,519,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.