FAP 115 over NINE MILE CREEK

IN WELLSVILLE · County 009, Tennessee · Built 1938 · 2 Lanes · 1,320 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
05SR1150003
Year Built
1938
Reconstructed
1988
Length
49.3 m (161.7 ft)
Max Span
9.4 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
1,320
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,277,000
Total Project Cost
$1,916,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.