FAP 73 over BRANCH

2.5 M W OF FOOTHILLS MTS · County 009, Tennessee · Built 1953 · 2 Lanes · 10,062 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
05SR0730025
Year Built
1953
Length
7.2 m (23.6 ft)
Max Span
3.2 m
Lanes
2
Daily Traffic
10,062
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$227,000
Total Project Cost
$341,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.