FAP 73 over LAUREL BANK BRANCH

4.1 M S OF SR115 · County 009, Tennessee · Built 1977 · 4 Lanes · 24,642 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
05SR0730007
Year Built
1977
Length
13.7 m (44.9 ft)
Max Span
4.2 m
Lanes
4
Daily Traffic
24,642
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$393,000
Total Project Cost
$590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.