NFA A545 over ELLEJOY CREEK

3 M. N. WALLAND. · County 009, Tennessee · Built 2023 · 2 Lanes · 300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
050A5450001
Year Built
2023
Length
25.9 m (85 ft)
Max Span
25.9 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
300
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$216,000
Total Project Cost
$325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.