FAP 30 over GLADE CREEK

1 MI JCT OF SR101 · County 007, Tennessee · Built 1956 · 3 Lanes · 1,467 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
04SR0300003
Year Built
1956
Length
11.3 m (37.1 ft)
Max Span
11.3 m
Width
9.4 m (30.8 ft)
Lanes
3
Daily Traffic
1,467
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$184,000
Total Project Cost
$277,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.