FAP 28 over BRANCH

.2 MI.NE.OF PIKEVILLE · County 007, Tennessee · Built 1957 · 3 Lanes · 4,319 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
04SR0280035
Year Built
1957
Reconstructed
2001
Length
6.9 m (22.6 ft)
Max Span
3 m
Width
24.8 m (81.4 ft)
Lanes
3
Daily Traffic
4,319
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$191,000
Total Project Cost
$287,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.