FAP 1 over BRANCH

AT MORRIS CHAPEL · County 005, Tennessee · Built 1947 · 2 Lanes · 5,419 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
03SR0010021
Year Built
1947
Length
7.3 m (24 ft)
Max Span
3.5 m
Lanes
2
Daily Traffic
5,419
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$184,000
Total Project Cost
$277,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.