FAP 64 over LEE BRANCH

6.1 MI.E.OF WARTRACE · County 003, Tennessee · Built 1985 · 2 Lanes · 2,332 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
02SR0640039
Year Built
1985
Length
13.6 m (44.6 ft)
Max Span
3 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
2,332
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$54,000
Total Project Cost
$82,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.