FAP 16 over LITTLE HURRICANE CREEK

NORTHWEST OF SHELBYVILLE · County 003, Tennessee · Built 1937 · 2 Lanes · 7,683 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
02SR0160019
Year Built
1937
Length
34.7 m (113.8 ft)
Max Span
8.7 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
7,683
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$434,000
Total Project Cost
$652,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.