TPP BIA RTE 11 over ROSEBUD CREEK

ROSEBUD STREET IN ROSEBUD · County 121, South Dakota · Built 2024 · 2 Lanes · 114 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
0000A07345B0039
Year Built
2024
Length
6.2 m (20.3 ft)
Max Span
6.2 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
114
Material
Concrete
Design
Culvert
Owner
Bureau of Indian Affairs
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.