44367 309TH STREET over JAMES RIVER

1.1S&2.4W OF MISSION HILL · County 135, South Dakota · Built 1952 · 2 Lanes · 2,250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000068156182
Year Built
1952
Length
130 m (426.5 ft)
Max Span
27.1 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
2,250
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$14,638,000
Total Project Cost
$14,668,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.