29895 BOYER AVE over CK

12.5E & 0.9S BERESFORD · County 127, South Dakota · Built 1992 · 2 Lanes · 70 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 5 Fair
Substructure 4 Poor

Location

43.055194, -96.519508

This bridge is in worse condition than 76.3% of bridges in County 127. The average bridge in South Dakota is 0 years old; this one is 34 years old.

Nearby Bridges

Bridge Details

Structure #
000000064145019
Year Built
1992
Length
8.4 m (27.6 ft)
Max Span
4.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
70
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$17,000
Total Project Cost
$25,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.