48296 307TH ST over CK
5.5S & 3.9E ALCESTER · County 127, South Dakota · Built 1977 · 2 Lanes · 55 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
42.938025, -96.573997
This bridge is in worse condition than 66.3% of bridges in County 127. The average bridge in South Dakota is 0 years old; this one is 49 years old.
Nearby Bridges
48190 308 STR. over CK
Built 1940
48080 308 STR. over EAST UNION CK
Built 1996
48060 306 STR. over EAST UNION CK
Built 1986
30880 RIVER RD over CK
Built 1979
30599 RIVER ROAD over CK
Built 1989
47860 307TH ST over WEST UNION CK
Built 1950
IA 12 over SIX MILE CREEK
Built 2013
47870 308 STR. over WEST UNION CK
Built 1957
48020 309 STR. over EAST UNION CK
Built 1950
SD011 over WEST UNION CK
Built 1969
Bridge Details
- Structure #
- 000000064129100
- Year Built
- 1977
- Length
- 7.8 m (25.6 ft)
- Max Span
- 7.2 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 55
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $17,000
- Total Project Cost
- $25,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.