WHITE HILL ROAD over BIG NASTY CK
3.5W 11.5N PRAIRIE · County 105, South Dakota · Built 1991 · 2 Lanes · 33 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
45.696411, -102.874844
This bridge is in worse condition than 33.3% of bridges in County 105. The average bridge in South Dakota is 0 years old; this one is 35 years old.
Bridge Details
- Structure #
- 000000053035175
- Year Built
- 1991
- Length
- 27.4 m (89.9 ft)
- Max Span
- 13.7 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 33
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.