HAMMERQUIST ROAD over RAPID CK
0.4 W FARMINGDALE · County 103, South Dakota · Built 2017 · 2 Lanes · 54 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.958928, -102.893817
This bridge is in worse condition than 22.4% of bridges in County 103. The average bridge in South Dakota is 0 years old; this one is 9 years old.
Nearby Bridges
HAMMERQUIST ROAD over RAPID CK
Built 1916
SD044 over DRAW
Built 1964
160TH AVE over RAPID CK
Built 1999
SD044 over CK
Built 1964
234TH STREET over TRIB TO RAPID CK
Built 1930
160TH AVENUE over CK
Built 1989
SD044 over CK
Built 1964
ANTELOPE CREEK RD over RAPID CK
Built 1980
SD044 over SWINE HART CK
Built 1964
BASELINE ROAD over TRIBUTARY TO RAPID CREEK
Built 2016
Bridge Details
- Structure #
- 000000052583387
- Year Built
- 2017
- Length
- 20.4 m (66.9 ft)
- Max Span
- 19.8 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 54
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.