SD079NF over ST JOSEPH ST RCP&E RR
1.2 S JCT SD 44 · County 103, South Dakota · Built 1964 · 4 Lanes · 23,179 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
44.062619, -103.191672
This bridge is in worse condition than 77.3% of bridges in County 103. The average bridge in South Dakota is 0 years old; this one is 62 years old.
Nearby Bridges
CAMBELL ST over CK
Built 1964
SD079 over MEADE ST. DRAINAGE
Built 1964
SIOUX AVE over MEADE DITCH
Built 1974
CREEK DRIVE over DRAINAGE DITCH
Built 1985
CHERRY AVE over MEADE DITCH
Built 1974
E MEADE ST&HOEFFER over MEADE ST DRAINAGE DITCH
Built 1978
CAMBELL ST over CK
Built 1964
ASPEN DRIVE over MEADE ST DRAINAGE DITCH
Built 2014
ST PATRICK ST over RAPID CK
Built 1972
E. MEADE ST. over MEADE ST DRAINAGE DITCH
Built 2007
Bridge Details
- Structure #
- 000000052430314
- Year Built
- 1964
- Length
- 220.7 m (724.1 ft)
- Max Span
- 39.6 m
- Width
- 17.2 m (56.4 ft)
- Lanes
- 4
- Daily Traffic
- 23,179
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,030,000
- Total Project Cost
- $3,500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.