477TH AVENUE over SLIP-UP CREEK
2.5E & 0.1S RENNER · County 099, South Dakota · Built 1983 · 2 Lanes · 168 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.644114, -96.671542
This bridge is in worse condition than 49.2% of bridges in County 099. The average bridge in South Dakota is 0 years old; this one is 43 years old.
Nearby Bridges
258TH ST HWY 130 over SLIP-UP CREEK
Built 1964
257TH STREET over SLIP-UP CREEK
Built 2019
477TH AVENUE over SLIP-UP CK
Built 1987
256TH STREET over SLIP-UP CREEK
Built 1938
257TH STREET over SILVER CREEK
Built 2024
258TH ST HWY 130 over SILVER CK
Built 2017
I090 over SLIP UP CK
Built 1993
478 AVE (FAS 1157) over I090
Built 2019
I090 W over I229
Built 1999
I090 E over I229
Built 1999
Bridge Details
- Structure #
- 000000050230141
- Year Built
- 1983
- Length
- 20.4 m (66.9 ft)
- Max Span
- 19.8 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 168
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $432,000
- Total Project Cost
- $686,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.