MAPLETON RD over BIG SIOUX RIVER
1.3W & 0.8N RENNER · County 099, South Dakota · Built 1990 · 2 Lanes · 59 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.6575, -96.744058
This bridge is in worse condition than 26.4% of bridges in County 099. The average bridge in South Dakota is 0 years old; this one is 36 years old.
Nearby Bridges
258TH ST HWY 130 over DIVERSION DITCH
Built 1966
258TH ST HWY 130 over BIG SIOUX RIVER
Built 1966
256TH STREET over BIG SIOUX RIVER
Built 1975
258TH ST HWY 130 over TRIB TO BIG SIOUX RV
Built 2008
472ND AVE HWY 133 over TRIB TO BIG SIOUX RV
Built 1955
258TH ST HWY 130 over SILVER CK
Built 2017
257TH STREET over SILVER CREEK
Built 2024
I029 NF over CK
Built 1963
258 ST (FAS 6364) over I029
Built 1962
257 ST over I029
Built 1963
Bridge Details
- Structure #
- 000000050192132
- Year Built
- 1990
- Length
- 68 m (223.1 ft)
- Max Span
- 14.6 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 59
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,153,000
- Total Project Cost
- $1,710,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.