FEYDER AVE over TURTLE CK

.2N INT MICKELSON-HARTFOR · County 099, South Dakota · Built 2000 · 2 Lanes · 50 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000050094158
Year Built
2000
Reconstructed
2002
Length
15.4 m (50.5 ft)
Max Span
3.7 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.