FAIRPOINT RD. over CK
34.5E&17.7N STURGIS · County 093, South Dakota · Built 1962 · 2 Lanes · 65 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Culvert
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 4 | Poor |
Location
44.671911, -102.809869
This bridge is in worse condition than 88.7% of bridges in County 093. The average bridge in South Dakota is 0 years old; this one is 64 years old.
Bridge Details
- Structure #
- 000000047375253
- Year Built
- 1962
- Length
- 6.7 m (22 ft)
- Max Span
- 3 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 65
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,000
- Total Project Cost
- $15,000