BREHM RD. over CK
29E & 15.5S STURGIS · County 093, South Dakota · Built 1935 · 1 Lanes · 10 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
2
Critical
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 2 | Critical |
| Substructure | 4 | Poor |
Location
44.190411, -102.930211
This bridge is in worse condition than 99.1% of bridges in County 093. The average bridge in South Dakota is 0 years old; this one is 91 years old.
Nearby Bridges
BREHM RD. over ELK CK
Built 1995
PIONEER RD. over ELK CK
Built 1955
ANTELOPE CREEK RD. over ELK CK
Built 1976
NEW UNDERWOOD RD. over ELK CK
Built 1992
ANTELOPE CREEK RD over ANTELOPE CK
Built 1976
154 AVE over I090
Built 1961
I090 W over 158 AVE
Built 1961
I090 E over 158 AVE
Built 1961
161ST AVENUE over TRIB TO BOXELDER CK
Built 1973
I090 W over 151 AVE (FAS) DRAW
Built 1961
Bridge Details
- Structure #
- 000000047320585
- Year Built
- 1935
- Length
- 17.4 m (57.1 ft)
- Max Span
- 4 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 10
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,000
- Total Project Cost
- $20,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.