NEMO ROAD over ELK CK
AT ROUBAIX · County 081, South Dakota · Built 1957 · 2 Lanes · 389 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
44.275522, -103.666025
This bridge is in worse condition than 46.3% of bridges in County 081. The average bridge in South Dakota is 0 years old; this one is 69 years old.
Nearby Bridges
US385 over BEAR BUTTE CK
Built 2002
US385 over MIDDLE BOX ELDER CK
Built 1995
NEMO ROAD over BOXELDER CK
Built 1974
NEMO ROAD over BOXELDER CK
Built 1974
900006: PETERSON over Whitewood Creek
Built 2011
US385 over WEST STRAWBERRY CK
Built 2002
US385 over WHITEWOOD CK
Built 1985
KIRK RD over WHITEWOOD CK
Built 2004
YELLOW CREEK ROAD over WHITEWOOD CK
Built 1979
KIRK RD over WHITEWOOD CK
Built 1990
Bridge Details
- Structure #
- 000000041195226
- Year Built
- 1957
- Length
- 6.7 m (22 ft)
- Max Span
- 3 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 389
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.