207TH ST over REDSTONE CK
8.1W DESMET · County 077, South Dakota · Built 1935 · 1 Lanes · 15 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
2
Critical
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 2 | Critical |
Location
44.383133, -97.714458
This bridge is in worse condition than 97.1% of bridges in County 077. The average bridge in South Dakota is 0 years old; this one is 91 years old.
Nearby Bridges
425TH AVENUE over REDSTONE CK
Built 1965
206TH STREET over REDSTONE CK
Built 1940
US014 over REDSTONE CK
Built 1987
425TH AVENUE over REDSTONE CK
Built 1963
425TH AVE over REDSTONE CK
Built 1989
210TH STREET over REDSTONE CK
Built 1950
213TH STREET over REDSTONE CK
Built 1940
208TH ST over SOUTH FORK PEARL CK
Built 1933
US014 over SOUTH FORK PEARL CK
Built 1965
205TH ST over SOUTH FORK PEARL CK
Built 1967
Bridge Details
- Structure #
- 000000039069110
- Year Built
- 1935
- Length
- 7.4 m (24.3 ft)
- Max Span
- 7.1 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 15
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $178,000
- Total Project Cost
- $302,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.