CAMP CROOK RD over CK
2.2N & 21.0W BUFFALO · County 063, South Dakota · Built 1960 · 2 Lanes · 97 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
45.6139, -103.976856
This bridge is in worse condition than 75.5% of bridges in County 063. The average bridge in South Dakota is 0 years old; this one is 66 years old.
Bridge Details
- Structure #
- 000000032040232
- Year Built
- 1960
- Length
- 9.4 m (30.8 ft)
- Max Span
- 4.6 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 97
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.