357TH AVE over CK

3W & 4.1 S MILLER · County 059, South Dakota · Built 1926 · 2 Lanes · 10 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 5 Fair
Substructure 4 Poor

Location

44.480811, -99.044106

This bridge is in worse condition than 69% of bridges in County 059. The average bridge in South Dakota is 0 years old; this one is 100 years old.

Nearby Bridges

Bridge Details

Structure #
000000030130301
Year Built
1926
Length
6.7 m (22 ft)
Max Span
6.4 m
Width
5.6 m (18.4 ft)
Lanes
2
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$160,000
Total Project Cost
$281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.