MAIN ST-MILBANK over SOUTH FORK WHETSTONE RV
EASTMAN AVE. MILBANK · County 051, South Dakota · Built 1990 · 2 Lanes · 200 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
45.228833, -96.640908
This bridge is in worse condition than 72.7% of bridges in County 051. The average bridge in South Dakota is 0 years old; this one is 36 years old.
Nearby Bridges
SD015 over SOUTH FORK WHETSTONE RV
Built 1982
W. MILBANK ST-MILB over SOUTH FORK WHETSTONE RV
Built 1984
US012 over N FORK WHETSTONE CK
Built 2013
477 AVENUE over SOUTH FORK WHETSTONE RV
Built 1989
US012 over BURLINGTON NORTHERN RR
Built 2013
479 AVENUE over SOUTH FORK WHETSTONE RV
Built 2003
477TH AVE over CK
Built 2000
476 AVENUE over SOUTH FORK WHETSTONE RV
Built 1999
479 AVENUE over CK
Built 1996
150 STREET over CK
Built 1925
Bridge Details
- Structure #
- 000000026292069
- Year Built
- 1990
- Length
- 10.5 m (34.4 ft)
- Max Span
- 10.1 m
- Width
- 5.9 m (19.4 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $600,000
- Total Project Cost
- $800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.