367TH AVENUE over S FORK SNAKE CREEK

6E & 6.6N MIRANDA · County 049, South Dakota · Built 1930 · 2 Lanes · 38 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000025360124
Year Built
1930
Reconstructed
1968
Length
14.9 m (48.9 ft)
Max Span
14.6 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
38
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,713,000
Total Project Cost
$1,743,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.