BISON LANE over FRENCH CK
11E 2S FAIRBURN · County 033, South Dakota · Built 1974 · 2 Lanes · 12 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.657764, -102.979936
This bridge is in worse condition than 57.4% of bridges in County 033. The average bridge in South Dakota is 0 years old; this one is 52 years old.
Bridge Details
- Structure #
- 000000017540147
- Year Built
- 1974
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.3 m
- Width
- 5.8 m (19 ft)
- Lanes
- 2
- Daily Traffic
- 12
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.