46610 305TH ST. over BAPTIST CK
8S & 14.1E IRENE SD · County 027, South Dakota · Built 1935 · 2 Lanes · 15 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 3 | Serious |
Location
42.967936, -96.883883
This bridge is in worse condition than 90.3% of bridges in County 027. The average bridge in South Dakota is 0 years old; this one is 91 years old.
Nearby Bridges
46610 304 ST. over BAPTIST CK
Built 2012
46540 307TH ST. over BAPTIST CK
Built 1940
46660 303 ST. over BAPTIST CK
Built 1995
46530 MARSHALTOWN over BAPTIST CK
Built 1995
46340 304 ST. over VERMILLION RV
Built 1996
30250 464 AVE over CK
Built 2005
46320 306 ST. over VERMILLION RV
Built 1970
46380 308 ST over VERMILLION RV
Built 1930
30260 463 AVE. over CK
Built 2017
46230 306 ST. over VERMILLION RV OVERFLOW
Built 1970
Bridge Details
- Structure #
- 000000014141080
- Year Built
- 1935
- Reconstructed
- 1991
- Length
- 14.3 m (46.9 ft)
- Max Span
- 5.1 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 15
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $188,000
- Total Project Cost
- $373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.