OLD HWY 212 over MUD ELM CK

13.5 E 0.8 N NEWELL · County 019, South Dakota · Built 2023 · 2 Lanes · 48 vehicles/day

Overall
Good
Culvert
8
Very Good

Condition Ratings

ComponentRatingDescription
Culvert 8 Very Good

Location

44.729475, -103.151583

This bridge is in worse condition than 38.7% of bridges in County 019. The average bridge in South Dakota is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
000000010445332
Year Built
2023
Length
6.3 m (20.7 ft)
Max Span
3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
48
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.