ZEONA ROAD over SPRING CREEK

1.ON & 1.1E HOOVER · County 019, South Dakota · Built 2020 · 2 Lanes · 4 vehicles/day

Overall
Fair
Culvert
5
Fair

Condition Ratings

ComponentRatingDescription
Culvert 5 Fair

Location

45.125981, -103.245756

This bridge is in worse condition than 73.2% of bridges in County 019. The average bridge in South Dakota is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
000000010398060
Year Built
2020
Length
11.5 m (37.7 ft)
Max Span
1.5 m
Width
4.9 m (16.1 ft)
Lanes
2
Daily Traffic
4
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.