ZEONA ROAD over SPRING CREEK
1.ON & 1.1E HOOVER · County 019, South Dakota · Built 2020 · 2 Lanes · 4 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
45.125981, -103.245756
This bridge is in worse condition than 73.2% of bridges in County 019. The average bridge in South Dakota is 0 years old; this one is 6 years old.
Bridge Details
- Structure #
- 000000010398060
- Year Built
- 2020
- Length
- 11.5 m (37.7 ft)
- Max Span
- 1.5 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 2
- Daily Traffic
- 4
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.