ARPAN RD over NORTH CANAL
5W 9 N NISLAND · County 019, South Dakota · Built 1967 · 2 Lanes · 51 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
44.808175, -103.649114
This bridge is in worse condition than 49.3% of bridges in County 019. The average bridge in South Dakota is 0 years old; this one is 59 years old.
Nearby Bridges
ARPAN RD over INDIAN CK
Built 1990
TAYLOR ROAD over NORTH CANAL
Built 1998
MAIL RD over NORTH CANAL
Built 1998
BEET RD over INDIAN CK
Built 2011
MAIL RD over CK
Built 1998
REID RD over NORTH CANAL
Built 1997
MAIL RD over INDIAN CK
Built 1940
BEET ROAD over INDIAN CK LATERAL
Built 1962
MAIL RD over INDIAN CK LATERAL
Built 1997
BROOKER RD over HILDER BRAND CK
Built 1985
Bridge Details
- Structure #
- 000000010200278
- Year Built
- 1967
- Reconstructed
- 1995
- Length
- 12.2 m (40 ft)
- Max Span
- 11.6 m
- Width
- 7 m (23 ft)
- Lanes
- 2
- Daily Traffic
- 51
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.