ARPAN RD over SOUTH CANAL
9.1E 4N B. FOURCHE · County 019, South Dakota · Built 1975 · 2 Lanes · 47 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.711103, -103.664136
This bridge is in worse condition than 39.4% of bridges in County 019. The average bridge in South Dakota is 0 years old; this one is 51 years old.
Nearby Bridges
ARPAN RD over SOUTH CANAL
Built 1975
REID RD over NORTH CANAL
Built 1997
BEET RD over SOUTH CANAL
Built 1997
BELLE FOURCHE INLE over INLET CANAL
Built 1999
FRUITDALE RD over BELLE FOURCHE RV
Built 1995
BEET ROAD over INDIAN CK LATERAL
Built 1962
MAIL RD over OWL CK
Built 1978
US212 over BELLE FOURCHE RV
Built 2002
SNOMA RD over MALONEY CK
Built 2022
MAIL RD over INDIAN CK LATERAL
Built 1997
Bridge Details
- Structure #
- 000000010192343
- Year Built
- 1975
- Length
- 45.4 m (149 ft)
- Max Span
- 22.6 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 47
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.