29450 413TH AVENUE over EMANUEL CREEK
8.5N & 3W OF TYNDALL · County 009, South Dakota · Built 1984 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
43.118783, -97.930811
This bridge is in worse condition than 55.6% of bridges in County 009. The average bridge in South Dakota is 0 years old; this one is 42 years old.
Nearby Bridges
41310 295TH STREET over EMANUEL CREEK
Built 2021
41280 294TH STREET over EMANUEL CREEK
Built 1972
41410 298TH STREET over EMANUEL CREEK
Built 1981
41240 293RD STREET over EMANUEL CREEK
Built 1972
29620 414TH AVENUE over EMANUEL CREEK
Built 2013
29210 412TH AVENUE over EMANUEL CREEK
Built 1975
41109 292ND STREET over EMANUEL CREEK
Built 1936
41090 296TH STREET over TRIB. TO EMANUEL CREEK
Built 1935
SD046 over EMANUEL CK
Built 1966
SD046 over CK
Built 1935
Bridge Details
- Structure #
- 000000005120035
- Year Built
- 1984
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.9 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $906,000
- Total Project Cost
- $936,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.