U.S. 221 over J. STROM THURMOND DAM

J.STROM THURMOND DAM · County 073, South Carolina · Built 1950 · 2 Lanes · 1,350 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
CEPSASGASCJST01
Year Built
1950
Length
334 m (1095.8 ft)
Max Span
14.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
1,350
Material
Steel
Design
Girder and Floorbeam System
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$202,000
Total Project Cost
$303,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.