S-20-20 over HOGFORK BRANCH

1.5 MI E OF I77 EXIT 46 · County 039, South Carolina · Built 2024 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

34.484167, -80.971111

This bridge is in worse condition than 15.1% of bridges in County 039. The average bridge in South Carolina is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
000000000010944
Year Built
2024
Length
21.3 m (69.9 ft)
Max Span
21.3 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.