S-30-34 over MILLERS FORK CREEK

5 MI NE OF CLINTON · County 059, South Carolina · Built 2023 · 2 Lanes · 175 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

34.514825, -81.809339

This bridge is in worse condition than 11.8% of bridges in County 059. The average bridge in South Carolina is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
000000000010666
Year Built
2023
Length
48.8 m (160.1 ft)
Max Span
30.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
175
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.