I-26 WB R 7001 PRO over SALUDA RIVER

4.2 MI NW OF COLUMBIA · County 079, South Carolina · Built 2024 · 4 Lanes · 91,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000010658
Year Built
2024
Length
259.5 m (851.4 ft)
Max Span
35.2 m
Width
18.4 m (60.4 ft)
Lanes
4
Daily Traffic
91,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.