SC 80 over SOUTH TYGER RIVER

2 MI E OF GREER · County 083, South Carolina · Built 2001 · 2 Lanes · 7,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000009666
Year Built
2001
Length
139.9 m (459 ft)
Max Span
28 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
7,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.