US 52 over COASTLINE RAILROAD

2 MI E OF GREELEYVILLE · County 089, South Carolina · Built 1998 · 5 Lanes · 3,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000009661
Year Built
1998
Length
57.6 m (189 ft)
Max Span
22.3 m
Width
26.2 m (86 ft)
Lanes
5
Daily Traffic
3,700
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$283,000
Total Project Cost
$311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.