I-85 NB over PACOLET RIVER

3.0 MI NW OF COWPENS · County 083, South Carolina · Built 1998 · 2 Lanes · 34,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000009362
Year Built
1998
Length
155 m (508.5 ft)
Max Span
45.1 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
34,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.