S-2-31 SBL over NORFOLK SOUTHERN (ABAND)

YORK ST IN AIKEN · County 003, South Carolina · Built 2017 · 2 Lanes · 3,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000008702
Year Built
2017
Length
21.3 m (69.9 ft)
Max Span
21.3 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
3,000
Material
Wood or Timber
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$144,000
Total Project Cost
$216,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.