US 601 over HALFWAY SWAMP

2 MI NE OF ST. MATTHEWS · County 017, South Carolina · Built 1993 · 2 Lanes · 2,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000008614
Year Built
1993
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
2,300
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.