C-26-696 over MAPLE SWAMP

4.0 MI NE OF CONWAY · County 051, South Carolina · Built 1992 · 2 Lanes · 250 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000008567
Year Built
1992
Length
34.1 m (111.9 ft)
Max Span
4.3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
250
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.