I-526 WB over US 52&S-60&RR CSXT&NS

IN N. CHARLESTON · County 019, South Carolina · Built 1992 · 3 Lanes · 41,150 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000008525
Year Built
1992
Length
3235.5 m (10615.2 ft)
Max Span
57 m
Width
14.7 m (48.2 ft)
Lanes
3
Daily Traffic
41,150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,097,000
Total Project Cost
$24,146,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.