S-43-52 over DUCKFORD BRANCH

3 MI SW OF PINEWOOD · County 085, South Carolina · Built 1980 · 2 Lanes · 800 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
4
Poor

Bridge Details

Structure #
000000000007410
Year Built
1980
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
800
Material
Prestressed Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$157,000
Total Project Cost
$236,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.