S-23-63 over SALUDA RIVER

4.8MI W GREENVILLE · County 045, South Carolina · Built 1980 · 2 Lanes · 6,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000007364
Year Built
1980
Length
147.2 m (482.9 ft)
Max Span
33.5 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
6,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.