S-23-920 over MOUNTAIN CREEK

5.8 MI NE GREENVILLE · County 045, South Carolina · Built 1976 · 2 Lanes · 8,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006871
Year Built
1976
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
8,700
Material
Prestressed Concrete
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$205,000
Total Project Cost
$308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.